Quy Hoạch Chi Tiết 1/2000 — QH Đồ Án Series
1,081 ha | Thừa Thiên Huế, Việt Nam | Pre-FS 2026
fromDegrees (no transform)| Item | HEART req. | Committed | Status |
|---|---|---|---|
| Availability | 99.999% | Viettel 99.95% · VNPT n/s | GAP |
| MTTR | ≤4 h | not committed (both) | GAP |
| Protection switch | ≤50 ms | Viettel ≤50 ms · VNPT mesh 1+2 | MET |
| RTD → Singapore | ≤20 ms | 21 ms SJC2 · 23 APG · 39 VSTN · Viettel ≤50 | 1 ms |
| Route diversity | 2 corridors | Viettel dual corridor · VNPT aerial+underground | MET |
| Capacity | tiered by phase | Viettel 4→12+ Tbps · VNPT >7 Tbps dom. | MET |
| Pricing MRC/NRC | required | deferred pending phase demand | TBD |
| Zone | Fibre | Duct | Primary use |
|---|---|---|---|
| CN | 576F | 63 m | AI DC anchor · hi-tech fabs (24F/lot) |
| DVĐH | 288F | 254 m | HQ · commercial · expert/worker FTTH |
| NC | 144F | 1,490 m | Labs · incubator · AI-robot test track |
| HTKT | 96F | 194 m | SCADA/OT · teleprotection (IEC 61850) |
| GT | 96F | 108 m | ITS · smart lighting · gate control |
| CX | 48F | 348 m | Environment sensors · flood telemetry |
| CXCL | 24F | 1,050 m | Perimeter CCTV · intrusion detection |
| Total | 1,272F | 3.5 km | + 6.54 km ring (288F) |
| Mã | Land-use category | VN | ha | % |
|---|---|---|---|---|
| CN | Industrial production & warehouse | Đất công nghiệp | 243.08 | 22.49 |
| DVĐH | Operation services & mixed-use | Đất dịch vụ điều hành, hỗn hợp | 343.64 | 31.79 |
| NC | R&D and training | Khu nghiên cứu – phát triển & đào tạo | 100.43 | 9.29 |
| CX | Green space & water surface | Đất cây xanh, mặt nước | 141.69 | 13.11 |
| CXCL | Isolation (buffer) green | Đất cây xanh cách ly | 19.59 | 1.81 |
| HTKT | Technical infrastructure | Đất hạ tầng kỹ thuật | 25.33 | 2.34 |
| GT | Roads & transport | Đất giao thông | 207.24 | 19.17 |
| TỔNG / TOTAL (Đất khu công nghệ cao) | 1,081.00 | 100.00 | ||
| # | Functional group | QH-06 codes | ha | % |
|---|---|---|---|---|
| A | Hi-tech production & R&D | CN + NC | 343.51 | 31.78 |
| B | Operation services & mixed-use | DVĐH | 343.64 | 31.79 |
| C | 🌲 Green & Water (QCVN) | CX + CXCL | 161.28 | 14.92 |
| D | Technical infrastructure | HTKT | 25.33 | 2.34 |
| E | Roads & transport | GT | 207.24 | 19.17 |
| TOTAL | 1,081.00 | 100.00 | ||
| Component | Green ha | % | ≥10% | ≥20% |
|---|---|---|---|---|
| CX — Đất cây xanh, mặt nước | 141.69 | 13.11 | — | — |
| CXCL — Đất cây xanh cách ly | 19.59 | 1.81 | — | — |
| CX + CXCL (master-plan green) | 161.28 | 14.92 | ✅ | ✗ (intra-lot tier) |
| ID | Road | Type | Lanes |
|---|---|---|---|
| SR-6 | NE-SW Penetrating Road | Main arterial | 4 |
| RING | Internal Ring Road | Internal ring | 2 |
| TRUMPET | Trumpet Interchange | Interchange | - |
| Route | Direction | Access |
|---|---|---|
| QL1A | North | Direct |
| TL14B | Through | Direct |
| TL15B | West | ~2km |
| Expressway | West | Interchange |
| Ring Road 3 | South | ~5km |
| Item | Target | QH-06 Actual | Status |
|---|---|---|---|
| Green space (CX+CXCL) | ≥10% | 14.92% | PASS |
| Industrial (CN) | — | 22.49% | OK |
| R&D / training (NC) | — | 9.29% | OK |
| Services & mixed-use (DVĐH) | — | 31.79% | OK |
| Technical infra (HTKT) | — | 2.34% | OK |
| Transportation (GT) | ≥5% | 19.17% | PASS |
| # | Mã | Color | Category (EN) | VN |
|---|---|---|---|---|
| 1 | CN | Industrial production & warehouse | Đất công nghiệp | |
| 2 | DVĐH | Operation services & mixed-use | Dịch vụ điều hành, hỗn hợp | |
| 3 | NC | R&D and training | Nghiên cứu – phát triển & đào tạo | |
| 4 | CX | Green space | Cây xanh | |
| 5 | MN | Water surface | Mặt nước, sông suối | |
| 6 | CXCL | Isolation (buffer) green | Cây xanh cách ly | |
| 7 | HTKT | Technical infrastructure | Hạ tầng kỹ thuật | |
| 8 | GT | Roads & transport | Giao thông |
| Route | Type | Access |
|---|---|---|
| QL1A | National Highway | Direct |
| Cam Lo–La Son Expy | Expressway | Trumpet IC |
| TL14B | Provincial Road | Through Park |
| Ring Road 3 Hue | Urban Ring | 5 km |
| # | Lat | Lon |
|---|---|---|
| 1 | 16.287941 | 107.689041 |
| 2 | 16.287364 | 107.689734 |
| 3 | 16.285709 | 107.692024 |
| 4 | 16.285220 | 107.691994 |
| 5 | 16.283991 | 107.691077 |
| … 195 vertices omitted … | ||
| 201 | 16.291654 | 107.689722 |
| 202 | 16.290964 | 107.688853 |
| 203 | 16.290135 | 107.687876 |
| 204 | 16.289723 | 107.688071 |
| 205 | 16.288716 | 107.688619 |
| # | X (East) | Y (North) |
|---|---|---|
| 1 | 573,443.20 | 1,801,562.99 |
| 2 | 573,517.51 | 1,801,499.38 |
| 3 | 573,762.83 | 1,801,317.00 |
| 4 | 573,759.83 | 1,801,262.89 |
| 5 | 573,662.26 | 1,801,126.62 |
| … 195 vertices omitted … | ||
| 201 | 573,514.57 | 1,801,974.11 |
| 202 | 573,421.98 | 1,801,897.40 |
| 203 | 573,317.85 | 1,801,805.28 |
| 204 | 573,338.84 | 1,801,759.80 |
| 205 | 573,397.81 | 1,801,648.58 |
?mp004=on.| Mã ký hiệu | DT (ha) | MĐXD | Tầng | HSSDĐ | 🔍 |
|---|---|---|---|---|---|
| Loading QH-06 lots… | |||||
| M1 | 2026-09 | Phase 1 boundary fixed |
| M2 | 2026-10 | Zoning task + 1/2,000 dossier approved |
| M3 | 2026-11 | FS approved · PPP–BOT signed |
| M4 | 2026-12 | Compensation notarised · FC1 |
| M5 | 2027-01 | Contract term starts · 1B released |
| M6 | 2027-10 | 150 MW energised · first handover |
| Tranche | Period | Scope | Area |
|---|---|---|---|
| 1A | 2026 | Part of PK-2 + part of the PK-4 technical block | 120–150 ha |
| 1B | from 2027 | Balance of Phase 1 — all of PK-2 and its attachments | 200–240 ha |
| 2 | 2028–2030 | PK-3, balance of PK-4, zone-wide frame utilities | 140–160 ha |
| 3 | 2030–2032 | Remaining area — PK-1, PK-5, isolation green, remaining roads | 570–620 ha |
| Total | 1,081 ha | ||
| # | Target | Content |
|---|---|---|
| M1 | by 15 Sep 2026 | City People's Committee fixes the Phase 1 boundary and assigns the body that prepares the plan |
| M2 | Oct 2026 | Phase 1 zoning task and 1/2,000 dossier approved |
| M3 | Oct–Nov 2026 | Feasibility study approved; PPP–BOT contract signed |
| M4 | 31 Dec 2026 | Tranche 1A compensation agreed and notarised within the validity of Decision 08/2026; financial close FC1 — 30% of total investment capital |
| M5 | 1 Jan 2027 | Contract term starts; tranche 1B released |
| M6 | Q4 2027 | 150 MW energised; first serviced land handed to the secondary investor |
| M7 | 2028 | Phase 2 dossier and works start once the gate is met |
| M8 | 2030 | Phase 3 dossier and works start once the gate is met |
| M9 | 1 Jan 2052 | Transfer to the City — 25-year BOT term ends |
| Ring | Tr | Traced ha | Band ha | Delta |
|---|---|---|---|---|
| T-1A | 1A | 258.16 | 120–150 | +108 over |
| T-1B | 1B | 163.39 | 200–240 | −37 under |
| T-2 | 2 | 288.20 | 140–160 | +128 over |
| T-3 | 3 | 344.66 | 570–620 | −225 under |
| Total traced | 1054.41 | 1,081 | −27 | |
| Ring | Class count | Elev | Slope |
|---|---|---|---|
| T-1A | EXCL 15 GOOD 3 MODE 5 OPTI 1 | 3–27 m | 0–50% |
| T-1B | CONS 2 EXCL 8 GOOD 1 OPTI 3 | 3–27 m | 0–41% |
| T-2 | CONS 11 EXCL 7 GOOD 6 MODE 8 OPTI 4 | 8–30 m | 0–29% |
| T-3 | EXCL 52 OPTI 10 | 0–27 m | 0–90% |
agent_core/scripts/generate_phasing_zones.py.
For the coordinate-accurate official drawing use tab ⑥ Land Use Planning (QH-06 1/2,000).
Select a zone or infrastructure element for details.